Installation and debugging of micro - screen hydraulic universal testing machine

    • Release time:2018-11-14 09:56:26
    • Views:3810

The installation and adjustment of micro - screen hydraulic universal testing machine is an important work. It is related to restoring the geometrical precision, the precision of indication and the service life of the machine. The work should therefore be carried out by professional staff.
The placement, installation, adjustment, watering and cementing of the test machine, connection of oil pipe, power connection, driving, test run and other work are carried out organically, and are related to each other, and each link should be taken seriously.
1. Installation conditions
The test machine should be installed in the room which is clean, dry, vibration-free and with uniform temperature, and enough maintenance space should be left around the test machine.
The main engine of the test machine shall be installed on the basis of concrete, and its size shall be determined according to the requirements of foundation drawings, wires, installation pipes and other devices. The upper plane of the foundation should be flat, straightened with a level gauge, and then installed on the testing machine after the foundation is dry.
2, installation,
2.1 the foundation engineering of the machine is constructed according to the foundation drawing.
2.2 initial alignment of the host
On the basis of the main engine, place the inclined iron and make the mounting bolt hole of the base coincide with the center of the base hole. Used in 2 groups in 4 locations.
Set the frame level in the center position above the work table (its precision is 0.05/1000) to adjust the host precision. Make it 0.1/1000.
2.3 casting and cementing of test machine foundation
2.3.1 testing machine precision alignment, the anchor nut with cement fixation, the pad iron pad underneath the stand firm, and cement base are all fill in the gap below to death, guarantee stand with good combination of cement base, prevent in use process due to vibration caused by the tester is not level, anchor nut after solid, cement dry before not tighten the anchor nut and start the machine (cement drying time is generally not less than 10-15 days). After the cement is completely dried, tighten the anchor nut and check the mounting accuracy of the test machine.
2.3.2 during the use of the test machine, due to the easy occurrence of looseness due to vibration, relevant parts should be fixed after the test machine has been used for some time.
2.4 to take over
When installing the oil pipe of the main engine, clean the oil pipe with kerosene first, and pay attention to whether the washer is complete at the joint. Oil cylinder pipe should be correctly taken over.
2.5 lubrication
The molybdenum disulfide grease can be applied on the lead screw to lubricate the lead screw and its mother. Molybdenum disulfide grease can be applied to avoid nibbling or death on sliding surface. The chain and sprocket shaft shall be regularly filled with thin grease.

濟南鉑鑒試驗機

Copyright 2010-2017 siyuan. All Right Reserved

主站蜘蛛池模板: 天天干网站 | 色婷婷综合久久久久中文一区二区 | 亚洲欧美国产一区二区三区 | 亚洲天堂视频在线观看 | 真不卡影院 | 日韩欧美在 | 日韩国产欧美综合 | 国产在线视频一区 | 伊人中文| 日韩在线视频免费观看 | 久久久精品网 | 欧美午夜一区二区 | 午夜精品久久久久久久传媒 | 国产精品美女久久久久高潮 | 国产精品99久久久久久大便 | 一级毛片免费版 | 欧美jizz18| 国产精品久久久不卡 | 日韩欧美二区 | 国产亚洲一区二区三区 | 看a黄大片 | 澳门永久av免费网站 | 成人免费在线观看 | 91久久精品一区二区二区 | 美女又爽又黄视频 | 日本公妇乱淫免费视频一区三区 | 99视频免费在线观看 | 精品在线99 | 91av视频免费观看 | 91麻豆精品久久久久蜜臀 | 亚洲国产99| 欧美中文字幕在线播放 | 亚洲视频免费在线 | 福利视频一区二区三区 | 最新日韩在线 | 毛片小视频 | 欧美少妇一区二区 | 欧美在线第一区 | 一级aaa级毛片午夜在线播放 | 免费黄色小视频 | 九色91av|