Installation and debugging of micro - screen hydraulic universal testing machine

    • Release time:2018-11-14 09:56:26
    • Views:3805

The installation and adjustment of micro - screen hydraulic universal testing machine is an important work. It is related to restoring the geometrical precision, the precision of indication and the service life of the machine. The work should therefore be carried out by professional staff.
The placement, installation, adjustment, watering and cementing of the test machine, connection of oil pipe, power connection, driving, test run and other work are carried out organically, and are related to each other, and each link should be taken seriously.
1. Installation conditions
The test machine should be installed in the room which is clean, dry, vibration-free and with uniform temperature, and enough maintenance space should be left around the test machine.
The main engine of the test machine shall be installed on the basis of concrete, and its size shall be determined according to the requirements of foundation drawings, wires, installation pipes and other devices. The upper plane of the foundation should be flat, straightened with a level gauge, and then installed on the testing machine after the foundation is dry.
2, installation,
2.1 the foundation engineering of the machine is constructed according to the foundation drawing.
2.2 initial alignment of the host
On the basis of the main engine, place the inclined iron and make the mounting bolt hole of the base coincide with the center of the base hole. Used in 2 groups in 4 locations.
Set the frame level in the center position above the work table (its precision is 0.05/1000) to adjust the host precision. Make it 0.1/1000.
2.3 casting and cementing of test machine foundation
2.3.1 testing machine precision alignment, the anchor nut with cement fixation, the pad iron pad underneath the stand firm, and cement base are all fill in the gap below to death, guarantee stand with good combination of cement base, prevent in use process due to vibration caused by the tester is not level, anchor nut after solid, cement dry before not tighten the anchor nut and start the machine (cement drying time is generally not less than 10-15 days). After the cement is completely dried, tighten the anchor nut and check the mounting accuracy of the test machine.
2.3.2 during the use of the test machine, due to the easy occurrence of looseness due to vibration, relevant parts should be fixed after the test machine has been used for some time.
2.4 to take over
When installing the oil pipe of the main engine, clean the oil pipe with kerosene first, and pay attention to whether the washer is complete at the joint. Oil cylinder pipe should be correctly taken over.
2.5 lubrication
The molybdenum disulfide grease can be applied on the lead screw to lubricate the lead screw and its mother. Molybdenum disulfide grease can be applied to avoid nibbling or death on sliding surface. The chain and sprocket shaft shall be regularly filled with thin grease.

濟南鉑鑒試驗機

Copyright 2010-2017 siyuan. All Right Reserved

主站蜘蛛池模板: 中文字幕在线视频一区 | 日日激情综合久久一区 | 亚洲一区二区三区在线免费观看 | 国产精品一区二区三 | 99免费精品视频 | 中文日产幕无线码一区二区 | 三级网站免费观看 | 国产成人精品一区二区三区在线 | 免费黄网站在线观看 | 亚洲精品国产综合区久久久久久久 | 成人av网站在线观看 | 国产精品三级在线 | 日韩精品在线免费观看 | 久久99亚洲精品 | 亚洲精品综合一区二区 | 中文字幕日韩av | 久久久久久久国产 | 国产一区二区三区视频在线 | 正在播放国产一区 | 国产在线免费 | 亚洲一区二区精品视频 | 久久国产99| 91麻豆蜜桃一区二区三区 | 国产精品成人在线观看 | 中文在线8新资源库 | av动漫天堂 | 日日夜夜天天综合 | 亚洲区一区二区 | 久久精品中文字幕 | 亚洲免费视频网站 | 国产91丝袜在线播放九色 | 欧美日韩综合视频 | 久久久鲁 | 久久精品亚洲一区二区 | 欧美二三区| 久久久亚洲综合 | 亚洲成人福利在线 | 精品国产乱码一区二区三区 | 亚洲久草 | 亚洲精品在线免费 | 久久精品国产亚洲一区二区三区 |