Installation and debugging of micro - screen hydraulic universal testing machine

  • 發(fā)布時(shí)間:2018-11-14 09:56:26
  • 網(wǎng)責(zé)任編輯:濟(jì)南鉑鑒測(cè)試技術(shù)有限公司
  • 人氣:3798

The installation and adjustment of micro - screen hydraulic universal testing machine is an important work. It is related to restoring the geometrical precision, the precision of indication and the service life of the machine. The work should therefore be carried out by professional staff.
The placement, installation, adjustment, watering and cementing of the test machine, connection of oil pipe, power connection, driving, test run and other work are carried out organically, and are related to each other, and each link should be taken seriously.
1. Installation conditions
The test machine should be installed in the room which is clean, dry, vibration-free and with uniform temperature, and enough maintenance space should be left around the test machine.
The main engine of the test machine shall be installed on the basis of concrete, and its size shall be determined according to the requirements of foundation drawings, wires, installation pipes and other devices. The upper plane of the foundation should be flat, straightened with a level gauge, and then installed on the testing machine after the foundation is dry.
2, installation,
2.1 the foundation engineering of the machine is constructed according to the foundation drawing.
2.2 initial alignment of the host
On the basis of the main engine, place the inclined iron and make the mounting bolt hole of the base coincide with the center of the base hole. Used in 2 groups in 4 locations.
Set the frame level in the center position above the work table (its precision is 0.05/1000) to adjust the host precision. Make it 0.1/1000.
2.3 casting and cementing of test machine foundation
2.3.1 testing machine precision alignment, the anchor nut with cement fixation, the pad iron pad underneath the stand firm, and cement base are all fill in the gap below to death, guarantee stand with good combination of cement base, prevent in use process due to vibration caused by the tester is not level, anchor nut after solid, cement dry before not tighten the anchor nut and start the machine (cement drying time is generally not less than 10-15 days). After the cement is completely dried, tighten the anchor nut and check the mounting accuracy of the test machine.
2.3.2 during the use of the test machine, due to the easy occurrence of looseness due to vibration, relevant parts should be fixed after the test machine has been used for some time.
2.4 to take over
When installing the oil pipe of the main engine, clean the oil pipe with kerosene first, and pay attention to whether the washer is complete at the joint. Oil cylinder pipe should be correctly taken over.
2.5 lubrication
The molybdenum disulfide grease can be applied on the lead screw to lubricate the lead screw and its mother. Molybdenum disulfide grease can be applied to avoid nibbling or death on sliding surface. The chain and sprocket shaft shall be regularly filled with thin grease.

濟(jì)南鉑鑒試驗(yàn)機(jī)

Copyright 2010-2017 siyuan. All Right Reserved備案號(hào):魯ICP備14010418號(hào)-12 

主站蜘蛛池模板: 欧美午夜免费 | 久久久久久一区二区三区四区别墅 | 欧美色图片一区二区 | 黑人一级 | 99国产精品久久久久久久久久 | 免费91看片 | 日韩久久免费视频 | 成人在线视频一区二区 | 精品电影一区二区 | 黄色片播放视频 | 一级在线观看 | 欧美人xxx | 亚洲成人网在线 | 中国一级片在线观看 | 国产精品久久久久久久7电影 | 日韩欧美大片网站 | 99在线精品免费视频九九视 | 国产精品日韩欧美一区二区三区 | 中文字幕在线观看av | 狠狠狠狠干 | 久久五月天综合 | 91免费版在线 | 国产精品国产a | 99综合在线 | 正在播放国产一区 | 国产日韩精品在线 | 在线精品一区 | 成人夜晚看av | 久久精品aaaaaa毛片 | 国产精品免费无遮挡 | 日本黄色片网站 | www.av在线| 天堂av中文字幕 | 天堂成人国产精品一区 | 亚洲高清福利 | 日韩亚洲欧美在线 | 青青草福利视频 | 欧美视频在线免费 | 91精品国产乱码久久久久久久久 | 成人在线网站 | 欧美日精品 |